Commercial EV Charging Stations

Give Your Customers and Tenants a Reason to Stay Longer.

Multi-port Level 2 and DC fast charger installation for businesses, parking lots, apartment communities, and hotels throughout Miami-Dade and Broward County.

  Call 786-930-4300 Request a Quote
Licensed EC13007781
Level 2 & DCFC
Full Permit Management
FPL Load Studies
2–4 Week Installation
2–4 wks

Typical Installation Timeline

6,500+

EV Registrations in Miami-Dade

Level 2

& DC Fast Charger Install

Scale

Infrastructure Built to Grow

Commercial EV Charging Services

EV ownership in South Florida is growing faster than the public charging network can keep up with. Businesses that offer on-site charging are gaining a measurable advantage in tenant retention, customer dwell time, and employee satisfaction.

Workplace Charging

Employees with EVs choose employers that offer workplace charging. We install Level 2 stations across your parking lot, sized to your current fleet count with conduit for future expansion.

Retail & Restaurant

Customers who charge while they shop stay longer and spend more. Multi-stall Level 2 systems for strip centers, shopping plazas, and standalone retail — installed around your business hours.

Apartment & Multifamily

EV charging is increasingly a dealbreaker for prospective tenants. We design scalable infrastructure — per-unit, shared access, or managed fleet — that grows with your building's EV adoption.

Hotels & Hospitality

EV-driving guests filter hotel searches by charging availability. We install networked multi-port stations with usage reporting, billing capability, and brand-compliant hardware options.

Fleet & Delivery

Converting a delivery or service fleet to electric requires planned high-amperage infrastructure. We size the panel service, run conduit, and install the exact charging capacity your fleet requires.

Permit & Utility Coordination

Commercial EV installations require building permits, sometimes FPL load studies, and occasionally service entrance upgrades. We handle all of it as part of every commercial EV project scope.

How We Plan a Commercial EV Charging Project

A well-planned charging installation is scalable, code-compliant, and ready to grow without rewiring. Here's how we approach it.

1

Site Assessment

We evaluate your existing electrical service, parking layout, panel capacity, and planned EV adoption rate to size the installation correctly.

2

Infrastructure Design

We design conduit runs and panel capacity for your current phase — and build in expansion capacity so adding stations later doesn't require rewiring.

3

Permitting & FPL

We submit building permits, coordinate any required FPL load study, and handle service entrance upgrades if needed before installation begins.

4

Installation & Sign-Off

Hardware installation, final city inspection, and utility interconnection. We provide complete permit documentation and project closeout paperwork.

Level 2 vs. DC Fast Charging: Which Is Right for Your Property?

The right charger type depends on how long vehicles typically stay at your location. We'll walk you through the tradeoffs during the free estimate — the answer isn't always obvious.

Level 2 (240V AC)

Best for Most Businesses
20–30 mi/hr

Best for locations where vehicles park for 2+ hours: workplaces, apartments, hotels, and restaurants. Lower infrastructure cost, broad EV compatibility, and the most cost-effective option for the majority of commercial properties.

  • Compatible with 100% of current EVs
  • Lower infrastructure and hardware cost
  • Easily scalable to 4, 8, 16+ ports
  • Load management available to reduce demand charges
  • Best ROI for most South Florida commercial properties

DC Fast Charger (DCFC)

High-Turnover Locations
100–250 mi/hr

Best for locations where vehicles stop briefly — gas station alternatives, highway corridors, and high-turnover retail. Higher infrastructure cost, but maximum throughput and revenue potential from charging fees.

  • Full charge in 20–45 minutes
  • Highest throughput per stall
  • Requires 480V 3-phase electrical service
  • Supports CCS, CHAdeMO, and NACS connectors
  • Revenue generation model available

Common Questions

A practical starting point: plan for 5–10% of total parking spaces in phase one, with conduit infrastructure installed for expansion to 20–30%. The right number depends on your customer or tenant dwell time, expected EV adoption rate, and whether you want to offer charging as a free amenity or a revenue-generating service. We'll work through the calculation specific to your property during the free estimate.

Commercial EV charging installations in Miami-Dade and Broward require electrical permits from the county building department. Larger installations may also require an FPL load study and a service entrance upgrade. We manage the entire permit process from application to final inspection sign-off as part of every commercial EV project. You don't need to coordinate with the city separately.

Yes. Most commercial EV charging networks — ChargePoint, Blink, EVgo, and others — offer networked stations with usage tracking, billing, and remote management built in. We handle the electrical infrastructure and hardware installation; the network software manages billing and reporting. You can offer charging free as an amenity, charge market rates, or use a hybrid model depending on your business goals.

Get a Commercial EV Charging Quote

Tell us your location type, number of desired charging ports, and parking layout. We'll put together a preliminary estimate within 24 hours. Call 786-930-4300 to speak with someone directly.

Ready to Add EV Charging to Your Property?

Most commercial EV charging projects are permitted and installed within 2–4 weeks. Let's get the process started.

CALL 786-930-4300